Skip to main content

Case Studies

Real projects. Real challenges. Real results. From Grade II listed castles to research vessels, retirement villages to luxury Kensington homes, these projects show how ECS brings survey, design, installation, commissioning and ongoing support together around the realities of each site.

Filter by service

Filter by sector

Showing 11 projects.

RRS Discovery, National Oceanography Centre
Maritime

RRS Discovery, National Oceanography Centre

Secured the main pedestrian entrance to RRS Discovery research vessel with read-in/read-out access control and roll-call capabilities. Installed within a limited docking window in Southampton.

Salto Access ControlVisitor Paging
Read full case study

Challenge

Working research vessel with strict schedule. Installation had to be completed during a scheduled docking period. Gate remained in constant use throughout.

Solution

Salto access control with read-in/read-out functionality and paging-based visitor call solution for personnel onboard.

Outcome

Secure and controlled access with complete audit trail. Practical solution tailored to a unique maritime environment.

West Byfleet Retirement Village
Residential

West Byfleet Retirement Village

New retirement village with 200 apartment doors, 90+ online doors, 500+ access cards, and 130+ CCTV cameras. Integrated with BMS, lifts, and door entry.

Salto Access ControlHikvision CCTV
Read full case study

Challenge

High volume of devices across multiple blocks. Coordination with electrical contractor essential. Access control needed to support integrations including BMS, lifts, and door entry.

Solution

Salto access control for 200 apartment doors and 90+ online doors. Hikvision CCTV with 130+ cameras, central server, and NVRs. Managed from landlord's comms room.

Outcome

Controlled access across the development with comprehensive CCTV coverage supporting resident safety.

Powder Mill Hotel
Hospitality

Powder Mill Hotel

Grade II listed hotel on 80-acre estate. Wireless smart locks to avoid disruption to listed building fabric. Client has since regularly added new access points.

Salto Wireless Access Control
Read full case study

Challenge

Listed property requiring exceptional care to minimise disruption. System needed to support mobile credentials alongside traditional guest cards.

Solution

Salto wireless smart locks — no wiring to every door, reducing cost, disruption, and time. Tailored to the hotel's operational and aesthetic requirements.

Outcome

Highly successful. Client has regularly added new access points as they experienced the effectiveness of the Salto software.

Future Greenwich College
Education

Future Greenwich College

New campus for London South East Colleges. Multi-system integrated package delivered as part of a large, fast-paced construction project with multiple stakeholders.

Intruder AlarmCCTVFire AlarmSalto Access ControlPA SystemRefuge SystemSpeed-Lane Turnstiles
Read full case study

Challenge

Multiple trades operating concurrently. Design evolved over time. Multiple stakeholders including main contractor, specialist contractor, and educational end client.

Solution

Senior, multi-disciplined engineering team with active project management. Bi-weekly site meetings. Integrated package across intruder alarm, CCTV, fire alarm, Salto access control, refuge system, PA system, and speed-lane turnstiles.

Outcome

Delivered on programme with strong H&S record. ECS has since been appointed to maintain the site.

OCS Facilities Services — Erith Leisure Centre
Commercial

OCS Facilities Services — Erith Leisure Centre

Critical PAVA upgrade at a live leisure centre. Existing system obsolete with no replacement parts available. Delivered without disruption to daily operations.

PA & Voice Alarm (PAVA)
Read full case study

Challenge

Live leisure centre remaining open throughout. Long operating hours with daily activities. Emergency messaging system needed to remain functional during upgrade.

Solution

Full rack and control equipment replacement. Planned upgrade approach with phased delivery around site opening hours and lower-traffic periods.

Outcome

Reliable life safety communications restored. Removed risk of obsolete equipment. Delivered on time without disruption. BS 5839-8 compliant.

Bader College (Herstmonceux Castle Campus)
Education

Bader College (Herstmonceux Castle Campus)

Queen's University international campus at Herstmonceux Castle. Category L2 fire detection and 175 wireless access control handles across the historic site.

Hyfire Wireless Fire AlarmSalto SPACE Access Control
Read full case study

Challenge

Obsolete fire detection devices and ageing MICC cabling. Access control handles no longer fit for purpose. Historic castle environment requiring minimal disruption.

Solution

Hyfire wireless fire alarm (Category L2). Salto SPACE with BLUEnet wireless technology — 26 gateways, 13 nodes, 175 wireless handles. Bespoke cover plates for clean finish.

Outcome

Fully compliant L2 fire detection and modern integrated wireless access control. Full audit trail across all 175 doors.

Wimpole Street
Luxury Residential

Wimpole Street

Grade II listed Georgian townhouse in Marylebone. Seven floors plus basement extension. Wireless fire detection and laser detection technology.

Intruder AlarmFire AlarmAccess ControlSecurity DoorsGarage AutomationLaser Detection
Read full case study

Challenge

Listed property with fast-paced schedule. Multiple trades in parallel. Systems needed to integrate while respecting aesthetic expectations.

Solution

Intruder alarm, fire alarm, access control, security doors, garage automation, and air-locking entrance. Laser detection and wireless fire detection. Grade 3 intruder alarm, Grade A LD2 fire alarm (BS 5839-6).

Outcome

Integrated fire and security solution respecting listed status. Secure, high-quality outcome aligned with client expectations.

Charlotte Street
Commercial

Charlotte Street

Refurbished flexible office space in Fitzrovia. Wireless fire alarm for adaptability as layouts change. Intruder alarm integrated with Paxton for overnight security.

Wireless Fire AlarmIntruder Alarm
Read full case study

Challenge

Fixed deadline with multiple trades. Office spaces intended to be reconfigured over time. Premises needed secure overnight operation.

Solution

Wireless fire alarm to support future layout changes. Intruder alarm connected to existing Paxton system for out-of-hours security.

Outcome

Adaptable fire alarm solution supporting the project timeline. Secure out-of-hours operation with authorised staff access maintained.

Campden Hill, Kensington
Luxury Residential

Campden Hill, Kensington

Grade II listed property in the heart of Kensington. Security equipment kept completely discreet — no obvious signs inside or outside the home.

Full Discreet Security Package
Read full case study

Challenge

Client wanted to feel secure without visible security equipment. Strict aesthetic standards. Grade II listed constraints.

Solution

Worked with interior designers, landscape team, and building contractor. Equipment samples and drawings provided for approval. Careful specification and positioning.

Outcome

Safe and secure environment with security equipment kept discreet and visually unobtrusive throughout.

Upper Phillimore Gardens, Kensington
Luxury Residential

Upper Phillimore Gardens, Kensington

16,630 sq ft seven-storey home in Kensington. Bespoke security programming integrated with AV and BMS systems. Invited to install without tender.

Full Security RedesignAV/BMS Integration
Read full case study

Challenge

Scope evolved during project. High-end finishes requiring equipment that balanced performance with visual alignment. Integration with AV and BMS systems.

Solution

New security designs reflecting the changing brief. Bespoke programming for tailored user experience. Bi-weekly meetings with design teams throughout.

Outcome

Client moved in on schedule with high-level security. ECS continues to maintain and monitor the property.

Herstmonceux Castle
Heritage

Herstmonceux Castle

15th century moated brick castle. Fully compliant LD2 fire detection designed within Heritage UK parameters. Wireless signal mapping for reliable communication.

Hyfire Wireless Fire Alarm
Read full case study

Challenge

Historic 15th century building with strict heritage controls. Equipment positioning and cabling methods carefully planned to protect architectural features.

Solution

Hyfire wireless fire detection system (LD2, BS 5839-1). Wireless signal mapping to confirm reliable communication. Compact, discreet equipment positioned sympathetically.

Outcome

Effective fire detection without intrusive cabling. Heritage features protected. Client testimonial: 'ECS were fantastic... their aftercare has been exemplary.'

"ECS were fantastic from the initial site visit dealing with Heritage UK and the planning consent. Their engineers were first class throughout. Their aftercare has been exemplary."

Ready to discuss your project?

Every project starts with a conversation. Tell us about your requirements and we will show you how ECS can help.