Built around your site
Scope before specification.
Fire-safety measures need to be considered alongside the specific building, its fire strategy and the arrangements for the people who use it. The responsible person retains responsibility for the wider fire-safety arrangements.
ECS can discuss the condition of an existing arrangement, the objectives for a new project and the practical interfaces that need to be considered before a proposal is developed.

